| Area : |
B + G – 60,000 ft2 area |
| Scope : |
Design and Built including all finishes (Turn Key) |
| Elements : |
CIS footings, 200mm thick precast concrete retaining walls for basement, 500 mm x 500mm double height columns, 160mm thick load bearing precast concrete walls, RCC Beams, Pre stressed Hollow Core slabs of 300mm/265mm/200mm thick, precast stair flight and landing slabs. |
| Program of Completion: |
Sub and superstructure using precast – 4 months |
| Finishes : |
Granite Flooring, UPVC Window/ Doors, Teak wood Doors, Schindler Lift, Asian Paint, False ceiling acoustic/Grid, MEP, Glazing, Water proofing |
| OFinishes Completion : |
05 months |
| Overall Completion : |
09 Months |